What commissioning covers
- Checks on installation, foundation connections and alignment
- Checks on fuel, lubrication, cooling and exhaust lines
- Checks on electrical, control and alarm connections
- First start and adjustments
- Load tests and performance measurements
- Attendance at sea trials and class surveys
- Operating training for the crew and plant staff
- Commissioning report and warranty registration
Why it matters
An engine that is not commissioned correctly can be damaged in its first hours, and the maker’s warranty is put at risk. When commissioning is done by the team that knows the engine and its parts, later maintenance runs from the same records.
How a commissioning job runs
- You send us the equipment model, serial number and installation status.
- We review the installation drawings and connections and flag anything missing.
- We carry out the checks on site and start the engine for the first time.
- We run the load tests and record the values.
- We train the staff and hand over with a commissioning report.